Feed In Tariff Scheme (FITs)

FIT diagram

 

The Government introduced a clean energy cash back scheme (known as Feed in Tariff Scheme) in April 2010.   If you have installed, or are thinking about installing, a renewable technology that produces electricity, you may be able to get paid for the electricity it produces.

 

The scheme covers the following electricity-generating technologies (up to an installation size of 5 Mega Watts and must be fitted by a MCS accredited installer):

 

  • Solar electricity PV (Photo Voltaic)
  • Wind turbine
  • Hydro electricity
  • Anaerobic digestion
  • Micro combined heat and power (mCHP) (pilot scheme only at this stage)

 

You will be entitled to:

 

  • A Generation Tariff – A fixed payment for every kWh generated
  • An Export Tariff A payment for every kWh exported to the grid
  • The use of electricity for free whilst it is being produced.

 

These payments will be:

 

  • no less frequent than quarterly
  • index linked to RPI (Retail Price Index)
  • tax free for domestic customers

 

The FIT payment rate for an Eligibile Installation of a description specified in the first column with an Eligibility Date on or after 1 April 2010 and before 1 April 2012 is the applicable rate specified in the corresponding entry in the column for the FIT Year in which the installation's Eligibility Date falls.

 

The FIT payment rates apply in respect of electricity generated or exported on or after 1 April 2012.  The FIT payment rates applying in respect of electricity generated or exported before 1 April 2012 are those set out in the FIT Payment Rate Table which was in force at the time of such generation or export.

 

Description FIT Year in which the Eligibility Date of Eligibile Installation falls
FIT Year 1
2010/11
FIT Year 2
2011/12
FIT Year 3
2012/13
Anaerobic digestion with total installed capacity of 250kW or less 12.7 If Eligibility Date is before
30.09.11                    12.7
14.7
If Eligibility Date is on/after
30.09.11                    14.7
Anaerobic digestion with total installed capacity greater than 250kW but not exceeding 500kW 12.7 If Eligibility Date is before
30.09.11                    12.7
13.6
If Eligibility Date is on/after
30.09.11                    13.6
Anaerobic digestion with total installed capacity greater than 500kW 9.9 9.9 9.9
Hydro generating station with total installed capacity of 15kW or less 21.9 21.9 21.9
Hydro generating station with total installed capacity greater than 15kW but not exceeding 100kW 19.6 19.6 19.6
Hydro generating station with total installed capacity greater than 100kW but not exceeding 2MW 12.1 12.1 12.1
Hydro generating station with total installed capacity greater than 2MW 4.9 4.9 4.9
Combined Heat and Power with total installed electrical capacity of 2kW or less (Tariff available only for 30,000 units) 11.0 11.0 11.0
Solar photovoltaic with total installed capacity of 4kW or less, where attached to or wired to provide electricity to a new building before first occupation 39.6 If Eligibility Date is before
03.03.12                   39.6
Higher rate
21.0*
Middle rate
16.8*
Lower rate
9.0*
If Eligibility Date is on/after
03.03.12                   21.0
Solar photovoltaic with total installed capacity of 4kW or less, where attached to or wired to provide electricity to a building which is already occupied 45.4 If Eligibility Date is before
03.03.12                   45.4
Higher rate
21.0*
Middle rate
16.8*
Lower rate
9.0*
If Eligibility Date is on/after
03.03.12                   21.0
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 4kW but not exceeding 10kW 39.6 If Eligibility Date is before
03.03.12                   39.6
Higher rate
16.8*
Middle rate
13.4*
Lower rate
9.0*
If Eligibility Date is on/after
03.03.12                   16.8
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 10kW but not exceeding 50kW 34.5 If Eligibility Date is before
03.03.12                   34.5
Higher rate
15.2*
Middle rate
12.2*
Lower rate
9.0*
If Eligibility Date is on/after
03.03.12                   15.2
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 50kW but not exceeding 100kW 34.5 If Eligibility Date is before
01.08.11                   34.5
Higher rate
12.9*
Middle rate
10.3*
Lower rate
9.0*
If Eligibility Date is on/after
01.08.11 and before
03.03.12                   19.9
If Eligibility Date is on/after
03.03.12                   12.9
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 100kW but not exceeding 150kW 32.2 If Eligibility Date is before
01.08.11                   32.2
Higher rate
12.9*
Middle rate
10.3*
Lower rate
9.0*
If Eligibility Date is on/after
01.08.11 and before
03.03.12                   19.9
If Eligibility Date is on/after
03.03.12                   12.9
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 150kW but not exceeding 250kW 32.2 If Eligibility Date is before
01.08.11                   32.2
Higher rate
12.9*
Middle rate
10.3*
Lower rate
9.0*
If Eligibility Date is on/after
01.08.11 and before
03.03.12                   15.7
If Eligibility Date is on/after
03.03.12                   12.9
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 250kW 32.2 If Eligibility Date is before
01.08.11                   32.2
8.9
If Eligibility Date is on/
after 01.08.11              8.9
Stand-alone (autonomous) solar photovoltaic (not attached to a building and not wired to provide electricity to an occupied building) 32.2 If Eligibility Date is before
01.08.11                   32.2
8.9
If Eligibility Date is on/
after 01.08.11              8.9
Wind with total installed capacity of 1.5kW or less 37.9 37.9 35.8
Wind with total installed capacity greater than 1.5kW but not exceeding 15 kW 29.3 29.3 28.0
Wind with total installed capacity greater than 15kW but not exceeding 100kW 26.5 26.5 25.4
Wind with total installed capacity greater than 100kW but not exceeding 500kW 20.6 20.6 20.6
Wind with total installed capacity greater than 500kW but not exceeding 1.5MW 10.4 10.4 10.4
Wind with total installed capacity greater than 1.5MW 4.9 4.9 4.9
Eligible Installations with a declared net capacity of 50kW or less Commissioned on or before 14th July 2009 and accredited under the ROO on or before 31st March 2010 9.9 9.9 9.9
EXPORT TARIFF 3.2 3.2 3.2

 

All FIT payment rates are pence per kilowatt hour at 2012/13 values.

 

The rates above have been adjusted by the annual RPI rate (as at December 2011) of 4.8 percent, except for those marked with an ‘*’. FIT payment rates in respect of FIT Year 4 and subsequent FIT Years are subject to adjustment under clause 3 of Part 1 of Schedule A as a result of changes in the Retail Price Index.

 

Contact Us

Tel: 01304 872218

Email: energy@dover.gov.uk


Find this page useful?
Please tell us what you think.

 

 

 

Dover District Council
White Cliffs Business Park
Dover, Kent CT16 3PJ

 

Tel: 01304 821199

E-mail: customerservices@dover.gov.uk

 

 

| Home Page | Search | Feedback | List Access Keys |